Rice-lake Counterpart Configurable Counting Indicator - Inst User Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 112
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
Installation 11
2.6.1 Dual Channel Units (S-XD Base)
For units that have dual channels, connect cable from the 14 pin connector to J1 and J2. If not using a dual base,
remove the J2 connector as shown in
Figure 2-8. Trim back the wires and tape.
Figure 2-7. J2 Connector Location
2.6.2 Dual Channel – Remote Scale Setup
For units that have dual channels and want to set up a scale remotely, use the following steps:
1. Remove the connector from the parts bag (included).
2. Wire per the load cell wiring code.
3. Plug into the J2 connector on the CPU board (example shown in Figure 2-7).
4. Set up the soft key - Scale Select (see Section 3.7 on page 27).
Figure 2-8. Remove J2 Connector if Using Single Base Scale or Only Single Base on a Dual Base
2.7 Wire Specifics
Wires connecting to J1, J2, J3, or J4 should adhere to the following specifications:
Wire Range Wire Strip Length
28~12 AWG stranded or solid wire 5~6 mm (3/16" ~ 1/4")
Table 2-2. Wire Specifications for Connectors
Shown connectors shipped
from the factory.
Remove connector off of J2
and tie off two wires.
J1 connector
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 111 112

Comments to this Manuals

No comments