Rice-lake TradeRoute HL Series - Installation Checklist User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 4
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
4 TradeRoute Checklist for Installation
9. Hydraulics
Verify that there are available onboard hydraulics that can meet the scale system performance specifications:
Maximum pressure of 3000 psi and 5 GPM flow rate (although a lower flow rate will only result in a
slower lifting a
nd lowering speed of the scale).
If no onboard hydraulics exist, the inst
aller must provide for this.
10.Indicator/Printer Mounting
Determine in advance how and where the digital indicator and printer, whether the in cab or outdoor version, will
be mounted, and where the hydraulic lifting and lowering controls will also be mounted for the convenience of the
operator.
In Cab Indicator Outdoor Enclosure
Figure 6. Indicator/Printer Location
11. Test Weights for Calibration
Establish how the scale will receive test weights for calibration. Discuss this with the end user and scale dealer, if
necessary.
Platform Loading Hanging Test Weights
Figure 7. Test Weight Loading
Rice Lake Weighing Systems
Page view 3
1 2 3 4

Comments to this Manuals

No comments